Project Overview
Phase I: located on the first floor of the business building of China Unicom. Five sets of 44 cold channels with a total power consumption of more than 220KW are used. The total installed capacity of UPS is 1800KVA.
Phase: Located on the third floor of the machine room building of China Unicom. The high heat density cold channel with a total power consumption of more than 220KW is adopted, including 6 sets of 50 cold channels and half of them. Total installed capacity of UPS 2400KVA
Business results
Phase I: inter column air conditioner, room level precision air conditioner, precision power distribution, machine, cold channel, dynamic ring, etc. About 4 million.
Phase II: inter column air conditioner, room level precision air conditioner, precision power distribution, machine, cold channel, dynamic ring, etc. About 6 million.